369 Ringwood Road, Parkstone, Poole, Dorset, BH12 4LT

HAV/00HQ/MNR/2025/0743 · Decided 2025-09-23 · bungalow · 2 bed

£889current rent (pcm)
£1600landlord proposed (pcm)
£1275tribunal decided (pcm)

Condition: Dated bungalow in need of modernisation with timber rot, damp and mould in the porch, mixed glazing, though kitchen and bathroom in good condition.

Evidence considered

Tenant submitted evidence: yes. Landlord submitted evidence: no.

Tribunal's reasoning

The tribunal first set a hypothetical open market rent of £1,500 pcm based on limited comparable evidence, its own expert knowledge, and adjustments for the property's location beside a busy road and a shared driveway used by an engineering firm, which was found likely to cause noise and inconvenience. It then applied a 15% aggregate deduction from that figure to reflect general disrepair (5%, including longstanding timber decay and damp not attributable to tenant refusal of access), partial single glazing and tenant-provided white goods (5%), and tenant-provided carpets and curtains (5%), excluding any value attributable to a boiler replacement which was not treated as a landlord improvement. This produced a final determined rent of £1,275 pcm, effective from 1 September 2025 as stated in the landlord's notice, with no hardship extension sought.

Read the original decision (PDF, GOV.UK)

Want the evidence, not just the decision?

Around half of the decisions in this database cite a problem with the evidence submitted — comparable tribunal outcomes are usually what decides these cases, for both sides. We're testing a paid evidence pack and a guided walkthrough of the application, built from this database.

Landlord evidence pack — from £15

Nearby tribunal outcomes, a rent level likely to survive a challenge, and an evidence pack in the format the tribunal expects — timed for when you serve a section 13 notice.

Register interest in the landlord pack

Tenant pack — from £19

Whether challenging your rent increase is worth it, plus the comparable decisions to include with your MR1 application to the tribunal.

Register interest in the tenant pack

Not built yet — register your interest by email and we'll let you know when it's ready. This isn't legal advice; see the law and free advice options.